All Issue

2022 Vol.55, Issue 9 Preview Page

Research Article

30 September 2022. pp. 687-700
Abstract
References
1
Cha, S.H., and Park, K.B. (2004). "A study on estimate of evaluation indices of water supply capacity for multipurpose dam." Journal of the Environmental Sciences, KENSS, Vol. 13, No. 3, pp. 197-204. 10.5322/JES.2004.13.3.197
2
Choi, S.J., Lee, D.R., and Moon, J.W. (2014). "Comparison of water supply reliability by dam operation methods." Journal of the Korean Water Resources Association, Vol. 47, No. 6, pp. 523-536. 10.3741/JKWRA.2014.47.6.523
3
Choi, Y.J., Lee, E.K., Ji, J.W., and Yi, J.E. (2020). "Water yield evaluation of a reservoir system based on a deficit supply in the Han River basin." Journal of the Korean Society of Civil Engineers, Vol. 40, No. 5, pp. 477-484.
4
Hashimoto, T., Stedinger, J.R., and Loucks, D.P. (1982). "Reliability, resiliency, and vulnerability criteria for water resource system performance evaluation." Water Resources Research, Vol. 18, No. 1, pp. 14-20. 10.1029/WR018i001p00014
5
Jain, S.K., and Bhunya, P.K. (2008). "Reliability, resilience and vulnerability of a multipurpose storage reservoir/Confiance, résilience et vulnérabilité d'un barrage multi-objectifs." Hydrological Sciences Journal, Vol. 53, No. 2, pp. 434-447. 10.1623/hysj.53.2.434
6
K-water (2014). A study on improvement of water supply evaluation method through standardization of drought water frequency and development of water scarcity indicators.
7
K-water (2019). Efficient use of existing water resources (Geumgang water system, Yeongseom water system multi-purpose dam, water dam).
8
Lee, D.H., Choi, C.W., Yu, M.S., and Yi, J.E. (2012). "Reevaluation of multi-purpose reservoir yield." Journal of Korea Water Resources Association, Vol. 45, No. 4, pp. 361-371. 10.3741/JKWRA.2012.45.4.361
9
Lee, G.M., and Yi, J.E. (2014). "Analysis of problems of water supply capacity determination in water resources systems" Journal of Korea Water Resources Association, Vol. 47, No. 4, pp. 331-342 10.3741/JKWRA.2014.47.4.331
10
Ministry of Construction and Transportation (MOCT), K-water, Korea Institute of Civil Engineering and Building Technology (KICT) (1999). Water resource planning optimization study (III): Water supply safety evaluation and water supply and demand planning system development.
11
Ministry of Land, Transport and Maritime Affairs (MLTM) (2011). Dam design criteria.
12
Ministry of Land, Transport and Maritime Affairs (MLTM) and K-water (2010). Existing dam reevaluation and optimal capacity allocation basic plan report.
13
Moy, W.S., Cohon, J.L., and ReVelle, C.S. (1986). "A programming model for analysis of the reliability, resilience, and vulnerability of a water supply reservoir." Water Resources Research, Vol. 22, No. 4, pp. 489-498. 10.1029/WR022i004p00489
14
Zhang, C., Xu, B., Li, Y., and Fu, G. (2017). "Exploring the relationships among reliability, resilience, and vulnerability of water supply using many-objective analysis." Journal of Water Resources Planning and Management, Vol. 143, No. 8, 04017044. 10.1061/(ASCE)WR.1943-5452.0000787
Information
  • Publisher :KOREA WATER RESOURECES ASSOCIATION
  • Publisher(Ko) :한국수자원학회
  • Journal Title :Journal of Korea Water Resources Association
  • Journal Title(Ko) :한국수자원학회 논문집
  • Volume : 55
  • No :9
  • Pages :687-700
  • Received Date : 2022-07-14
  • Revised Date : 2022-08-16
  • Accepted Date : 2022-09-02