All Issue

2026 Vol.59, Issue 7 Preview Page
31 July 2026. pp. 678-689
Abstract
References
1

Abedi, T., and Mojiri, A. (2019). “Constructed wetland modified by biochar/zeolite addition for enhanced wastewater treatment.” Environmental Technology & Innovation, Vol. 16, 100472.

10.1016/j.eti.2019.100472
2

Ahmad, H.A., Ahmad, S., Gao, L., Wang, Z., El-Baz, A., and Ni, S.Q. (2023). “Energy-efficient and carbon neutral anammox-based nitrogen removal by coupling with nitrate reduction pathways: A review.” Science of the Total Environment, Vol. 889, 164213.

10.1016/j.scitotenv.2023.164213
3

Ahn, S., and Kim, H. (2024). “Measures for Achieving carbon neutrality in domestic wastewater treatment plants.” Journal of Korean Society of Environmental Engineers, Vol. 46, No. 7, pp. 370-381.

10.4491/KSEE.2024.46.7.370
4

Akratos, C.S., and Tsihrintzis, V.A. (2007). “Effect of temperature, HRT, vegetation and porous media on removal efficiency of pilot-scale horizontal subsurface flow constructed wetlands.” Ecological Engineering, Vol. 29, No. 2, pp. 173-191.

10.1016/j.ecoleng.2006.06.013
5

Ávila, C., Bayona, J.M., Martín, I., Salas, J.J., and García, J. (2015). “Emerging organic contaminant removal in a full-scale hybrid constructed wetland system for wastewater treatment and reuse.” Ecological Engineering, Vol. 80, pp. 108-116.

10.1016/j.ecoleng.2014.07.056
6

Ávila, C., Salas, J.J., Martin, I., Aragón, C., and García, J. (2013). “Integrated treatment of combined sewer wastewater and stormwater in a hybrid constructed wetland system in southern Spain and its further reuse.” Ecological Engineering, Vol. 50, pp. 13-20.

10.1016/j.ecoleng.2012.08.009
7

De Klein, J.J., and Van der Werf, A.K. (2014). “Balancing carbon sequestration and GHG emissions in a constructed wetland.” Ecological Engineering, Vol. 66, pp. 36-42.

10.1016/j.ecoleng.2013.04.060
8

Ge, Z., Wei, D., Zhang, J., Hu, J., Liu, Z., and Li, R. (2019). “Natural pyrite to enhance simultaneous long-term nitrogen and phosphorus removal in constructed wetland: three years of pilot study.” Water Research, Vol. 148, pp. 153-161.

10.1016/j.watres.2018.10.037
9

Gupta, P., Ann, T.W., and Lee, S.M. (2016). “Use of biochar to enhance constructed wetland performance in wastewater reclamation.” Environmental Engineering Research, Vol. 21, No. 1, pp. 36-44.

10.4491/eer.2015.067
10

Gwak, Y. (2017). Study on characteristics of nitrogen removal during winter season in the A2O process packed with polyurethane media. Master Thesis, Yeungnam University, pp. 5-8.

11

Haydar, S., Anis, M., and Afaq, M. (2020). “Performance evaluation of hybrid constructed wetlands for the treatment of municipal wastewater in developing countries.” Chinese Journal of Chemical Engineering, Vol. 28, No. 6, pp. 1717-1724.

10.1016/j.cjche.2020.02.017
12

Hong, J., and Gil, K. (2025). “Estimation of carbon storage through constructed wetland operated with STP effluent.” Journal of Korea Water Resources Association, Vol. 58, No. 8, pp. 637-645.

10.3741/JKWRA.2025.58.8.637
13

Hong, J., Kim, Y.H., and Gil, K. (2024). “Research on adsorption capacity of acetaminophen for constructed wetland design.” Korean Wetlands Society, Vol. 26, No. 3, pp. 272-278.

10.17663/JWR.2024.26.3.272
14

Kadlec, R.H. (2016). “Large constructed wetlands for phosphorus control: A review.” Water, Vol. 8, No. 6, 243.

10.3390/w8060243
15

Kim, S., and Zoh, K. (2015). “Green infrastructure plan and design for urban hydrological cycle restoration - Focused on the overseas case studies of landscape architecture plan and design.” Journal of the Urban Design Institute of Korea Urban Design, Vol. 16, No. 3, pp. 37-51.

16

Kim, S.H., Cho, J.S., Park, J.H., Heo, J.S., Ok, Y.S., Delaune, R.D., and Seo, D.C. (2016). “Long-term performance of vertical-flow and horizontal-flow constructed wetlands as affected by season, N load, and operating stage for treating nitrogen from domestic sewage.” Environmental Science and Pollution Research, Vol. 23, No. 2, pp. 1108-1119.

10.1007/s11356-015-5214-z
17

Kim, Y.H. (2024). A test bed study for the basic design and operation of the constructed wetland using the municipal wastewater treatment plant effluent. Master Thesis, Seoul National University of Science&Technology, pp. 4-5.

18

Liao, K., Hu, H., Ma, S., and Ren, H. (2019). “Effect of microbial activity and microbial community structure on the formation of dissolved organic nitrogen (DON) and bioavailable DON driven by low temperatures.” Water Research, Vol. 159, 397-405.

10.1016/j.watres.2019.04.049
19

Lu, L., Guest, J.S., Peters, C.A., Zhu, X., Rau, G.H., and Ren, Z.J. (2018). “Wastewater treatment for carbon capture and utilization.” Nature Sustainability, Vol. 1, No. 12, pp. 750-758.

10.1038/s41893-018-0187-9
20

Martín, M., Gargallo, S., Hernández-Crespo, C., and Oliver, N. (2013). “Phosphorus and nitrogen removal from tertiary treated urban wastewaters by a vertical flow constructed wetland.” Ecological Engineering, Vol. 61, pp. 34-42.

10.1016/j.ecoleng.2013.09.046
21

Maucieri, C., Salvato, M., and Borin, M. (2020). “Vegetation contribution on phosphorus removal in constructed wetlands.” Ecological Engineering, Vol. 152, 105853.

10.1016/j.ecoleng.2020.105853
22

Mesquita, M.C., Albuquerque, A., Amaral, L., and Nogueira, R. (2017). “Seasonal variation of nutrient removal in a full-scale horizontal constructed wetland.” Energy Procedia, Vol. 136, pp. 225-232.

10.1016/j.egypro.2017.10.246
23

Ministry of Climate, Energy and Environment (MCEE) (2025). 2024 Statistics of sewerage, accessed 5 Feburary 2026, <https://library.mcee.go.kr/#/search/detail/5927573?offset=1>.

24

Presidential Water Commission (2024). Research on establishing a roadmap for achieving carb on neutrality in the water sector by 2050, accessed 5 Feburary 2026, <https://www.water.go.kr/board/CommitteePublications/10243>.

25

Rosli, F.A., Lee, K.E., Goh, C.T., Mokhtar, M., Latif, M.T., Goh, T.L., and Simon, N. (2017). “The use of constructed wetlands in sequestrating carbon: An overview.” Nature Environment & Pollution Technology, Vol. 16, No. 3, pp. 813-819.

26

Saeed, T., Haque, I., and Khan, T. (2019). “Organic matter and nutrients removal in hybrid constructed wetlands: Influence of saturation.” Chemical Engineering Journal, Vol. 371, pp. 154-165.

10.1016/j.cej.2019.04.030
27

Seo, J.M. (2015). A study on coagulant dose optimizationsystem for total phosphorus removalin sewage, Ph. D. Dissertation, University of Seoul, pp. 11-18.

28

Shen, S., Li, X., Cheng, F., Zha, X., and Lu, X. (2020). “Review: recent developments of substrates for nitrogen and phosphorus removal in CWs treating municipal wastewater.” Environmental Science and Pollution Research, Vol. 27, No. 24, pp. 29837-29855.

10.1007/s11356-020-08808-y
29

Stathatou, P.M., Dedousis, P., Arampatzis, G., Grigoropoulou, H., and Assimacopoulos, D. (2019). “Energy savings and reduced emissions in combined natural and engineered systems for wastewater treatment and reuse: The WWTP of Antiparos Island, Greece.” Desalination and Water Treatment, Vol. 159, pp. 13-23.

10.5004/dwt.2019.23995
30

Vymazal, J. (2005). “Horizontal sub-surface flow and hybrid constructed wetlands systems for wastewater treatment.” Ecological Engineering, Vol. 25, No. 5, pp. 478-490.

10.1016/j.ecoleng.2005.07.010
31

Vymazal, J. (2007). “Removal of nutrients in various types of constructed wetlands.” Science of the Total Environment, Vol. 380, No. 1-3, pp. 48-65.

10.1016/j.scitotenv.2006.09.014
32

Vymazal, J. (2014). “Constructed wetlands for treatment of industrial wastewaters: A review.” Ecological Engineering, Vol. 73, pp. 724-751.

10.1016/j.ecoleng.2014.09.034
33

Yang, R., and Yang, Q. (2024). “A review of emerged constructed wetlands based on biochar filler: Wastewater purification and carbon sequestration/greenhouse gas reduction.” Environmental Engineering Research, Vol. 29, No. 2, 230105.

10.4491/eer.2023.105
34

Ye, J., Li, Y., Chang, G., Chen, X., Wang, C., and Zhang, J. (2025). “Potential of carbon neutrality for a wastewater treatment plant based on recovery of carbon dioxide and heat from chemical looping combustion of sludge.” Journal of Water Process Engineering, Vol. 75, 108081.

10.1016/j.jwpe.2025.108081
35

Zhai, J., Xiao, J., Rahaman, M.H., John, Y., and Xiao, J. (2016). “Seasonal variation of nutrient removal in a full-scale artificial aerated hybrid constructed wetland.” Water, Vol. 8, No. 12, 551.

10.3390/w8120551
36

Zhang, C., Wen, L., Wang, Y., Liu, C., Zhou, Y., and Lei, G. (2020). “Can constructed wetlands be wildlife refuges? A review of their potential biodiversity conservation value.” Sustainability, Vol. 12, No. 4, 1442.

10.3390/su12041442
37

Zhao, L., Fu, D., Wu, X., Yuan, X., Wang, S., and Duan, C. (2024). “Opposite response of constructed wetland performance in nitrogen and phosphorus removal to short and long terms of operation.” Journal of Environmental Management, Vol. 351, 120002.

10.1016/j.jenvman.2023.120002
Information
  • Publisher :KOREA WATER RESOURECES ASSOCIATION
  • Publisher(Ko) :한국수자원학회
  • Journal Title :Journal of Korea Water Resources Association
  • Journal Title(Ko) :한국수자원학회 논문집
  • Volume : 59
  • No :7
  • Pages :678-689
  • Received Date : 2026-03-06
  • Revised Date : 2026-04-27
  • Accepted Date : 2026-05-08